Nov 12, 2026 · Ryan Burnett

Keep a Free-Extras List for 30 Days

Most small trade and service owners give away work every week. They just never see the total.

An extra trip because a part was wrong. A "while you're here" fix. Moving an outlet six inches. One more round of revisions. Each one feels too small to bill.

Add them up for a month and it usually isn't small.

The habit

For the next 30 days, write one line every time you or your crew does something that wasn't in the quote. That's the whole habit.

Each line gets:

  • Date
  • Job
  • What you did
  • Rough time and material
  • Did the customer ask for it?
  • Did it get billed?

A notebook in the truck works. So does a note on your phone or one spreadsheet tab. You don't need new software for this. A simple tool that does one job beats a big system you'll stop opening after a week.

Write the line when it happens, not on Friday. By Friday you'll remember half of it.

Get the crew in on it too. A lot of the extras happen when you're not on site. Tell them it's not about blame. You just want to see where the time goes.

Rough numbers are fine. "About an hour, one box of fittings" is enough. You're looking for a pattern, not an invoice.

Sort it into three piles

At the end of 30 days, go through the list and put every line into one of three piles.

Goodwill. Things you're glad you did. Helping a longtime customer with a two-minute fix. Staying a few minutes late to finish clean. Keep these. Just know what they cost you.

Should have been a change order. The customer asked for something outside the job, and you did it without a price. A different finish after you started. One more room. Extra revisions. This is the pile that's usually bigger than people expect.

Estimating miss. Work you had to do to finish the original job, but didn't bid. Nobody asked for a change. Your quote was just short.

These three piles look the same in the bank account. They need different fixes.

Fix each pile differently

The change-order pile is a contract problem. Put a short written rule in your next quote: changes the customer asks for get priced and approved in writing before the work starts. A text reply counts. Then follow it.

The estimating pile is a template problem. If the same step keeps showing up, add it to your estimate template so it's in the next bid from the start.

The goodwill pile doesn't need fixing. Keep giving it, on purpose. The difference is you'll know when "goodwill" is really a missed change order.

A simple example

Say your list shows ten lines in a month. Three are goodwill. Five are customer requests nobody priced. Two are steps you always forget to bid.

You don't need to raise every price. You need a change rule for the five and a template fix for the two. That's a much smaller, cheaper fix than padding every bid.

Don't want to wait 30 days?

The list shows you what's happening from now on. It doesn't show what already slipped through on the jobs you just finished.

If you'd rather have a tool that gets the next extras signed before the work starts, that's what ScopeGuard does. You type the change and the price on your phone, the customer signs from a link, and you get a signed PDF and a running total. Signature reminders are rolling out to founding shops, and texting is coming soon. Pro is $29/month. Founding shops get 60 days free, then $15/month locked for life.

Start the list today. Or join the founding shops.

Ryan Burnett, Parallax Media Group